Pre-terminated fiber optic patch panels in data centers


Definition of a pre-terminated fiber optic patch panel.

Pre-terminated fiber optic distribution frames are also known as mpo fiber optic distribution boxes. Wiring equipment for terminating, protecting, connecting and managing pre-terminated fiber optic cables and fibers in fiber optic communication networks. Pre-terminated fiber optic distribution frame data high density fiber optic distribution frame, mainly used for data center MDA, IDA or HDA wiring area fiber optic backbone connection and wiring management.

Installation environment and configuration of pre-terminated fiber optic distribution frames

Pre-terminated fiber optic patch panels are installed in 19" racks and cabinets. SC adapter front panel or MPO adapter module or MPO adapter front panel can be installed. The selection is based on the data center drawing design or the construction on site.

Classification of pre-terminated fiber optic distribution frames.

Pre-terminated fiber optic patch panels are customizable and the pre-terminated modules inside are free to mix and match. The available types of pre-terminated fiber optic distribution frames are: 96 core 1u high density fiber optic distribution frame, 1u mpo fiber optic distribution frame, 3u mpo fiber optic distribution frame.

Pre-terminated fiber optic distribution frame product features.

1 Pre-terminated fiber optic patch panel design includes cable management frame and label strips

2 with movable core management ring for more flexible management

3 using high-quality cold-rolled steel plate production: plate through strict degreasing, pickling, anti-rust phosphate, pure water cleaning, and then electrostatic spraying, spraying thickness of 80μm-100μm, in line with the European rohs environmental standards

4 greatly save the space of the cabinet, improve the utilization rate of the cabinet.

5 Modular structure for easy upgrade and maintenance

6 The maximum number of fiber cores that can be managed is up to 864 if an MPO adapter board is installed. With movable core management ring for more flexible management

7 Termination Boxes with Duplex LC Adapters for up to 288 managed fiber cores


Recommended>>
1、Workflow for Oozie Distributed Tasks Scripting Chapter
2、Golang Language md5 and random strings
3、Features of Zookeeper and how it works
4、Custom swiper animation of the implementation of two animation effects
5、25 Must Remember SSH Commands

    已推荐到看一看 和朋友分享想法
    最多200字,当前共 发送

    已发送

    朋友将在看一看看到

    确定
    分享你的想法...
    取消

    分享想法到看一看

    确定
    最多200字,当前共

    发送中

    网络异常,请稍后重试

    微信扫一扫
    关注该公众号